iXPanelTA70Service&MaintenanceManualEnglishMAEN012A,2010-12
Installation3Installation3.1 SpaceRequirements• Installation plate thickness: 1.5 - 9.0 mm (0.06 - 0.35 inch)• Space requirements when installing the
Installation2.Place the panel cut out where the operator panel is to be situated, draw alongthe outer sides of the holes and cut according to the mark
Installation4.Connect the cables in the specified order, according to the drawing and stepsbelow.Caution:• Ensurethattheoperatorpanelandthecontrollersy
Installation3.2.1 ConnectionstotheControllerFor information about the cables to be used when connecting the operator panel tothe controller, please re
Technical Data4TechnicalDataParameter iX Panel T A70Frontpanel,WxHxD 219x154x6mmMountingdepth 56mm(156mmincludingclearance)Frontpanelseal IP66Rear pan
Chemical Resistance5 ChemicalResistance5.1 MetalCasingThe frame and casing material is powder-coated aluminum. This powder paintwithstands exposure to
Chemical Resistance5.2 TouchScreenandOverlay5.2.1 AutotexF157/207Autotex F157 or F207 covers the overlay surrounding the touch screen.SolventR esistan
Chemical Resistance5.2.2 TouchScreenSurfaceThetouchscreensurfaceonthepanelwithstandsexposuretothefollowingsolvents without visible ch ange:Solvents Ti
Hardware Tests6 HardwareTestsBefore the operator panels are approved for market introduction, they are testedby independent authorities. The iX Panels
Hardware Replacement7 HardwareReplacementThis section contains instructions on how to replace operator panel hardware.Only components included in the
ForewordService&MaintenancemanualforiXPanelTA70ForewordThis manual contains detailed information about iX Panel TA70, includingdescriptions of var
Hardware Replacement7.2 CablesMostoftheoperatorpanelsusethesametypeofflexcableconnectors.connector flangesFlex cable connectorTo release the flex cables
Hardware Replacement7.3 ReplacingtheRearCoverThe following is needed:• Anewrearcover,seeAvailable Spare Parts for iX Panel TA70• AtorxT10screwdriverNo
Hardware Replacement7.4 ReplacingtheDisplay/DisplayCableThe following is needed:• A new display including plastic frame and display cable, seeAvailabl
Hardware Replacement7.4.1 SelfTestoftheDisplayTo perform a self test of the display, follow the steps below:1.Start the operator panel in a self test
Hardware Replacement7.5 ReplacingtheCompleteFrontThe following is needed:• Anewfront,seeAvailable Spare P arts for iX Panel T A70• AtorxT10screwdriver
Hardware Replacement7.6 ReplacingtheBacklightIf the backlight of the iX Panel TA70 is broken, the entire display must be replaced.To replace the displ
Hardware Replacement7.7 AvailableSparePartsforiXPanelTA70Ordernumber Description601009274 COMPLETEFRONTIncludingfrontcover,touchoverlay,gasketsandlabe
Service Menu8ServiceMenuThe service menu for the operator panel can be accessed before a project isdownloaded, or by setting the mode s witches in mod
Service Menu8.3.2 Date/TimeUse the Date/Time Settings dialog to set the time zone, date and time for thepanel.8.3.3 EraseProjectThe erase function wil
Hardware Self Test9 HardwareSelfTestThe self test program can be used to test aspects of operator panel functionalityand the communication ports. To r
ContentsContents1 Safety Precautions ... 51.1 General ...
Hardware Self Test9.1 SelfTestItemsThe following tests, of which some may be dismissed, are performed:Test itemMaybedismissed PlugRS422(short-circuit)
Additional Installation Tips10 AdditionalInstallationTipsWhen experiencing communication p roblems in for example noisy environmentsor when operating
Additional Installation Tips10.2 EthernetConnectioninthePanel123451-12-23-38-8RJ45RJ45RJ45RJ45RJ45RJ45RJ45RJ45Industrial EthernetOperator panelOperato
Additional Installation Tips10.3 ToAchieveBetterEMCProtection• Initially, use the original cabling from Beijer Electronics prima rily.• Use shielded c
Additional Installation Tips10.4 AmbientTemperatureThe maximum ambient temperature for the operator panel is provided in thespecifications. The ambient
Additional Installation Tips10.5 SafetyMost of the operator panels are fed with 24 V DC.412434Power supply230 V AC to 24 V DCPower supply230 V AC to 2
Additional Installation Tips10.6 GalvanicIsolationUSBUSBRS232RS422/485+24 V DC0 VFilterDC/DCgalvanic isolationVCC0 V (GND)DC/ACCFLEthernetInternal ele
Additional Installation Tips10.7 CableandBusTerminationRS485• Use shielded and twisted pair cable. The pair capacitance may not exceed 52.5pF/m and ar
Fault Tracing11 FaultTracingThis section includes different fault scenarios and steps to follow to trace the fault.TheiXPanelTA70isnotworkingproperly,
Fault TracingThetouchscreenismalfunctioningorisnotrespondingatall1.Re-calibrate the touch screen according to the Calibrating the Touch Screen sec-tio
Contents10 Additional Installation Tips ... 3110.1 Grounding the Operator Panel ...
Software12 SoftwareThis chapter describes how to maintain and update the software in th e iX Panels.The chapter includes a general descriptio n of the
Software12.2 UpdateSoftwareWhen an update is available, an e-mail is sent to the distributors. The software isalso available on the manufacturer’s web
SoftwareRequirementsUpgrading of the operator panel system program requires the following:• APC• An Ethernet connection between the PC and the operato
Environmental Aspects13 EnvironmentalAspectsThis chapter includes information about the environmental impact of iX Panels.More information can be foun
Environmental Aspects13.3 RecyclingThe operator panels consist largely of aluminum. It is a great advantage in terms ofboth resources and the environm
HeadofficeBeijerElectronicsABBox42620124Malmö,Swedenwww.beijerelectronics.com/+4640358600
Safety Precautions1SafetyPrecautionsBoth the installer and the owner and/or operator of the operator panel must readand understand this installation m
Safety Precautions1.3 DuringUse• Keep the operator panel clean.• Emergency stop and other safety functions may not be controlled from theoperator pane
Introduction2IntroductionThis manual describes h ow to maintain the iX Panel TA70.The functions available in iX Developer depend on which operator pan
Introduction2.2 MaintenanceCarefully read the instruction s before beginning maintenance on the operatorpanel.• Only qualified personnel should carry o
Introduction2.5 ContactandSupportIf you want to report a fault or have a question about the operator panels, pleasecontact your local supplier or fill
Commentaires sur ces manuels