Beijer-electronics iX T7B EN Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Panneau de contrôle Beijer-electronics iX T7B EN. Beijer Electronics iX T7B EN User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer

Résumé du contenu

Page 1 - InstallationManual

iXT7BInstallationManualEnglishMAEN095C,2013-09

Page 2 - Foreword

Installation2.2.2 OtherConnectionsandPeripheralsCables, peripheral equipment and accessories must be suitable for the applicationand its environment.

Page 3 - Contents

Technical Data3TechnicalDataParameter iX T7BFrontpanel,W×H×D 204×143×7mmCutoutdimensions,W×H187×126mmMountingdepth 43mm(143mmincludingclearance)Standa

Page 4 - 1SafetyPrecautions

Technical DataParameter iX T7BOperatingtemperature-10°C–+50°CStoragetemperature -20°C–+70°CRelativehumidity 5%–85%non-condensedApprovalsandcertificatio

Page 5 - 1.3 DuringInstallation

Chemical Resistance4 ChemicalResistance4.1 MetalCasingThe frame and casing material is powder-coated aluminum. This powder paintwithstands exposure to

Page 6 - 1.6 DismantlingandScrapping

Chemical Resistance4.2 TouchScreenandOverlay4.2.1 AutoflexEBA180LAutoflex EBA 180L covers the overlay surrounding the touch screen.SolventResistanceAuto

Page 7 - 2Installation

Chemical Resistance4.2.2 TouchScreenSurfaceThe touch screen surface on the operator panel withstands exposure to thefollowing solvents without visible

Page 8 - 2.2 InstallationProcess

Operator Panel Drawings5 Opera torPanelDrawings5.1 Connectors1234567Pos. Connector Description1 Powersupply +24VDC(18-32VDC)2 COM1/2 CommunicationPort

Page 9 - 2.2.1 Connectionstot

Operator Panel Drawings5.3 iXT7BOutline126 9943max. 11 mm714318720499Note:AStepCADfileisavailableonthewebsitewww.beijerelectronics.comBeijerElectronics

Page 10 - Installation

Additional Installation Tips6 AdditionalInstallationTipsWhen experiencing communication problems in for example noisy environmentsor when operating cl

Page 11 - 3TechnicalData

Additional Installation TipsNote:Thegroundingwiresshouldbeshortandtheconductorshouldhavealargearea.Along,thingroundingwirehasaveryhighimpedance(resist

Page 12 - Technical Data

ForewordInstallationmanualforiXT7BForewordAll operator panels are developed to satisfy the demands of human-machinecommunication. Built-in functions s

Page 13 - 4 ChemicalResistance

Additional Installation TipsA good solution may be to use a shielded Ethernet cable, but to co nnect the shieldat one end only.One option is to break

Page 14 - 4.2 TouchScreenandOverlay

Additional Installation Tips6.3 ToAchieveBetterEMCProtection• Initially, use the original cabling from Beijer Electronics primarily.• Use shielded cab

Page 15 - 4.2.3 AutoflexEBA180L

Additional Installation Tips6.4 AmbientTemperatureThe maximum ambient temperature for the operator panel is provided in thespecifications. The ambient

Page 16 - 5 Opera torPanelDrawings

Additional Installation Tips6.5 SafetyMost of the operator panels are fed with 24 V DC.412434Power supply230 V AC to 24 V DCPower supply230 V AC to 24

Page 17 - 5.3 iXT7BOutline

Additional Installation Tips6.6 GalvanicIsolationUSBUSBRS232RS422/485+24 V DC0 VFilterDC/DCgalvanic isolationVCC0 V (GND)DC/ACCFLEthernetInternal elec

Page 18 - 6 AdditionalInstallationTips

Additional Installation Tips6.7 CableandBusTerminationRS485• If maximum transfer distan ce and maximum transfer speed is needed,shielded and twisted p

Page 19 - OperatorPanel

HeadofficeBeijerElectronicsABBox4 2620124Malmö,Swedenwww.beijerelectronics.com/+4640358600

Page 20 - BeijerElectronics, MAEN095C

ContentsContents1 SafetyPrecautions ... 41.1 General ...

Page 21

Safety Precautions1SafetyPrecautionsBoth the in staller and the owner and/or operator of the operator panel must readand understand this installation

Page 22 - 6.4 AmbientTemperature

Safety Precautions• For Canada also AVERTISSEME NT – AVANT DE DECONNECTERL’EQUIPEMENT, COUPER LE COURANT OUS’ASSURER QUEL‘EMPLACEMENT EST DESIGNE NON

Page 23 - 6.5 Safety

Safety Precautions• Separate the high voltage, signal and supply cables.• Make sure that the voltage and polarity of the power source i s correct befo

Page 24 - 6.6 GalvanicIsolation

Installation2Installation2.1 SpaceRequirements• Maximum installation plate thickness: 11 mm• Space requirements in millimeters when installing the ope

Page 25

Installation2.2 InstallationProcessThe following is needed:• A Phillips/slot screwdriver1.Unpack and check the delivery. If damage is found, notify th

Page 26 - 20124Malmö,Sweden

Installation4.Connect the cables in the specified order, according to the drawing and stepsbelow.Caution:• Ensurethattheoperatorpanelandthecontrollersy

Commentaires sur ces manuels

Pas de commentaire