Beijer-electronics iX Panel T100 EN Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Panneau de contrôle Beijer-electronics iX Panel T100 EN. Beijer Electronics iX Panel T100 EN User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 46
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
iXPanelT100
Service&MaintenanceManual
English
MAEN007,2010-05
Vue de la page 0
1 2 3 4 5 6 ... 45 46

Résumé du contenu

Page 1 - Service&MaintenanceManual

iXPanelT100Service&MaintenanceManualEnglishMAEN007,2010-05

Page 2 - Foreword

Installation3Installation3.1 SpaceRequirements• Installation plate thickness: 1.5 - 9.0 mm (0.06 - 0.35 inch)• Space requirements when installing the

Page 3 - Contents

Installation2.Place the panel cut out where the operator panel is to be situated, draw alongthe o uter sides of the holes and cut according to the mar

Page 4

Installation4.Connect the cables in the specified order, according to the drawing and stepsbelow.Caution:• Ensurethattheoperatorpanelandthecontrollersy

Page 5 - 1SafetyPrecautions

Installation3.2.1 ConnectionstotheControllerFor information about the cables to be used w hen connecting the operator panel tothe controller, please r

Page 6 - 1.5 DismantlingandScrapping

Technical Data4TechnicalDataParameter iXPanelT100Frontpanel,WxHxD 302x228x6mmMountingdepth 58mm(158mmincludingclearance)Frontpanelseal IP66Rear panel

Page 7 - 2Introduction

Chemical Resistance5 ChemicalResistance5.1 MetalCasingThe frame and casing material is powder-coated aluminum. This powder paintwithstands exposure to

Page 8 - 2.4 DismantlingandScrapping

Chemical Resistance5.2 TouchScreenandOverlay5.2.1 AutotexF157/207Autotex F157 or F207 covers the overlay surrounding the touch screen.SolventR esistan

Page 9 - 2.5 ContactandSupport

Chemical Resistance5.2.2 TouchScreenSurfaceThetouchscreensurfaceonthepanelwithstandsexposuretothefollowingsolvents without visible change:Solvents Tim

Page 10 - 3Installation

Hardware Tests6 HardwareTestsBefore the operator panels are approved for m arket introduction, they are testedby independent authorities. The iX Panel

Page 11 - 0.5 - 1.0 Nm

Additional Hardware7 AdditionalHardware7.1 MemoryCardAn internal Compact Flash memory card can be used in iX Panel T100 forexpansion of the project me

Page 12 - – Connect cable D

ForewordService&MaintenancemanualforiXPanelT100ForewordThis manual contains detailed information about iX Panel T100, includingdescriptions of var

Page 13 - BeijerElectronics, MAEN007

Additional Hardware5.Re-attach the back cover to the operator panel.6.Turn on the power to the operator panel.When the operator panel starts up, you w

Page 14 - 4TechnicalData

Hardware Replacement8 HardwareReplacementThis section contains instructions on how to replace operator panel hardware.Only components included in the

Page 15 - 5 ChemicalResistance

Hardware ReplacementMODE Description1100 Notused(runmode).1110 Self-test.xxx1 Hardreset(forcesthes ystemtorese t).To ch ange mode switches, follow the

Page 16 - 5.2 TouchScreenandOverlay

Hardware Replacement8.3 ReplacingtheRearCoverThe following is needed:• Anewrearcover,seeAvailable Spare Parts for iX Panel T100• AtorxT10screwdriverNo

Page 17 - 5.2.3 AutoflexEB

Hardware Replacement8.4 ReplacingtheDisplay/DisplayCableThe following is needed:• A ne w display/display cable, see Available Spare Parts for iX Panel

Page 18 - 6 HardwareTests

Hardware Replacement5.Remove the mounting plate (9 torx screws). Gently lift the mounting platewith the display and power card.9 x torx screws6.Flip t

Page 19 - 7 AdditionalHardware

Hardware Replacement8.5 ReplacingtheCompleteFrontThe following is needed:• Anewfront,seeAvailable Spare Parts for iX Panel T100• AtorxT10screwdriverNo

Page 20 - 7.1.2 SettingsiniXDeveloper

Hardware Replacement8.6 ReplacingtheBacklightNote:Alllampsinthedisplaymustbereplacedatthesametime.The following is needed:• A new backlight, see Avail

Page 21 - 8 HardwareReplacement

Hardware Replacement8.7 AvailableSparePartsforiXPanelT100Ordernumber Description601009276 COMPLETEFRONTIncludingfrontcover,touchoverlay,gasketsandlabe

Page 22 - 8.2 Cables

Service Menu9ServiceMenuThe service menu for the operator panel can be accessed before a project isdownloaded, or by setting the mode switches in mode

Page 23 - 8.3 ReplacingtheRearCover

ContentsContents1 SafetyPrecautions ... 51.1 General ...

Page 24 - • AtorxT10screwdriver

Service Menu9.3.3 EraseProjectThe erase function will detect if the project is located in the panel memory or on amemory card. Pressing Erase P roject

Page 25 - 8.4.1 Self-testoftheDisplay

Hardware Self Test10 HardwareSelfTe stThe self-test program can be used to test aspects of operator panel functionalityand the communication ports. To

Page 26 - 8.5 ReplacingtheCompleteFront

Additional Installation Tips11 AdditionalInstallationTipsWhen experiencing communication problems in for example noisy environmentsor when operating c

Page 27 - 8.6 ReplacingtheBacklight

Additional Installation Tips11.2 EthernetConnectioninthePanel123451-12-23-38-8RJ45RJ45RJ45RJ45RJ45RJ45RJ45RJ45Industrial EthernetOperator panelOperato

Page 28 - Hardware Replacement

Additional Installation Tips11.3 ToAchieveBetterEMCProtection• Initially, use the original cabling from Beijer Electronics primarily.• Use shielded ca

Page 29 - 9ServiceMenu

Additional Installation Tips11.4 AmbientTemperatureThe maximum ambient temperature for the operator panel is provided in thespecifications. The ambient

Page 30 - 9.3.5 TouchCalibrate

Additional Installation Tips11.5 SafetyMost of the operator panels are fed with 24 V DC.412434Power supply230 V AC to 24 V DCPower supply230 V AC to 2

Page 31 - 10 HardwareSelfTe st

Additional Installation Tips11.6 GalvanicIsolationUSBUSBRS232RS422/485+24 V DC0 VFilterDC/DCgalvanic isolationVCC0 V (GND)DC/ACCFLEthernetInternal ele

Page 32 - 11 AdditionalInstallationTips

Additional Installation Tips11.7 CableandBusTerminationRS485• Use shielded and twisted pair cable. The pair capacitance may not exceed 52.5pF/m and ar

Page 33

Fault Tracing12 FaultTracingThis section includes different fault scenarios and steps to follow to trace the fault.TheiXPanelT100isnotw orkingproperly

Page 34 - Shielded cable Shielded cable

Contents9.3.3 EraseProject ...309.3.4 FormatMemoryCard ...30

Page 35 - 11.4 AmbientTemperature

Fault TracingTheiXPanelT100isworking,butoneormorekeysarenotworking1.Check that the flex cables are correctly fitted.2.Replace the front according to the

Page 36 - 11.5 Safety

Software13 SoftwareThis chapter describes how to maintain and update the software in the iX Panels.The chapter includes a general description of the o

Page 37 - 11.6 GalvanicIsolation

Software13.2 UpdateSoftwareWhen an update is available, an e-mail is sent to the distributors. The software isalso available on the manufacturer’s web

Page 38 - Inside operator panel

SoftwareTransferImage1.Double-click on the executable Image Loader file to start the transfer program.2.Follow the instructions.The image transfer proc

Page 39 - 12 FaultTracing

Environmental Aspects14 EnvironmentalAspectsThis chapter includes inform ation about the environmental impact of iX Panels.More information can be fou

Page 40

Environmental Aspects14.3 RecyclingThe operator panels consist largely of aluminum. It is a great advantage in terms ofboth resources and the environm

Page 41 - 13 Software

HEADOFFICE SUBSIDIARIESSWEDEN GERMANY USABeijerElectronicsProductsAB Elektronik-SystemeLauerGmbH&Co. KG BeijerElectronicsInc.Box426 Kelterstraße59

Page 42 - 13.2 UpdateSoftware

Safety Precautions1SafetyPrecautionsBoth the installer and the owner and/or operator of the operator panel must readand understand this installation m

Page 43 - TransferImage

Safety Precautions1.3 DuringUse• Keep th e operator panel clean.• Emergency stop and other safety functions may not be controlled from theoperator pan

Page 44 - 14 EnvironmentalAspects

Introduction2IntroductionThis manual describes how to maintain the iX Panel T100.The functions available in iX Developer depend on which operator pane

Page 45 - 14.3 Recycling

Introduction2.2 MaintenanceCarefully read the instruction s before beginning maintenance on the operatorpanel.• Only qualified personnel should carry o

Page 46

Introduction2.5 ContactandSupportIf you want to report a fault or have a questio n about the operator panels, pleasecontact your local supplier or fill