Beijer-electronics iX Panel K60 EN Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Panneau de contrôle Beijer-electronics iX Panel K60 EN. Beijer Electronics iX Panel K60 EN User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer

Résumé du contenu

Page 1 - InstallationManual

iXPanelK60InstallationManualEnglishMAEN997,2010-04

Page 2 - Foreword

Technical Data3TechnicalDataParameter iX Panel K60Frontpanel,WxHxD 275x168x6mmMountingdepth 57mm(157mmincludingclearance)Frontpanelseal IP66Rear panel

Page 3 - Contents

Chemical Resistance4 ChemicalResistance4.1 MetalCasingThe frame and casing material is powder-coated aluminum. This powder paintwithstands exposure to

Page 4 - 1SafetyPrecautions

Chemical Resistance4.2 TouchScreenandO verlay4.2.1 AutotexF157/207Autotex F157 or F207 covers the overlay surrounding the touch screen.SolventResistan

Page 5 - 1.5 DismantlingandScrapping

Chemical Resistance4.2.2 TouchScreenSurfaceThetouchscreensurfaceonthepanelwithstandsexposuretothefollowingsolvents with out visible change:Solvents Ti

Page 6 - 2Installation

Operator Panel Drawings5 OperatorPanelDrawings5.1 CommunicationPortsRS-232RS-422RS-422/485RS-485EthernetUSBBeijerElectronics, MAEN99714

Page 7 - 0.5 - 1.0 Nm

Operator Panel Drawings5.2 iXPanelK60OutlineBeijerElectronics, MAEN99715

Page 8 - Ethernet

Operator Panel Drawings5.3 iXPanelK60TextStrip94,5169Text max 17,0x8,0Text max 16,0x8,018,45 18,9 18,9 18,9 18,9 18,9 18,45 10,3BeijerElectronics, MAE

Page 9 - 2.2.1 ModeSwitches

Additional Installation Tips6 AdditionalInstallationTi psWhen experiencing communication problems in for example noisy environmentsor when operating c

Page 10 - 3TechnicalData

Additional Installation Tips6.2 EthernetConnectioninthePanel123451-12-23-38-8RJ45RJ45RJ45RJ45RJ45RJ45RJ45RJ45Industrial EthernetOperator panelOperator

Page 11 - 4 ChemicalResistance

Additional Installation Tips6.3 ToAchieveBetterEMCProtection• Initially, use the original cabling from Beijer Electronics primarily.• Use shielded cab

Page 12 - 4.2 TouchScreenandO verlay

ForewordInstallationmanualforiXPanelK60ForewordAll iX Panels are developed to satisfy the demands of human-machinecommunication. Built-in functions su

Page 13 - 4.2.3 AutoflexEB

Additional Installation Tips6.4 AmbientTemperatureThe maximum ambient temperature for the operator panel is provided in thespecifications. The ambient

Page 14 - 5 OperatorPanelDrawings

Additional Installation Tips6.5 SafetyMost of the operator panels are fed with 24 V DC.412434Power supply230 V AC to 24 V DCPower supply230 V AC to 24

Page 15 - 5.2 iXPanelK60Outline

Additional Installation Tips6.6 GalvanicIsolationUSBUSBRS232RS422/485+24 V DC0 VFilterDC/DCgalvanic isolationVCC0 V (GND)DC/ACCFLEthernetInternal elec

Page 16 - 5.3 iXPanelK60TextStrip

Additional Installation Tips6.7 CableandBusTerminationRS485• Use shielded and twisted pair cabl e. The pair capacitance may not exceed 52.5pF/m and ar

Page 17 - 6 AdditionalInstallationTi ps

HEADOFFICE SUBSIDIARIESSWEDEN GERMANY USABeijerElectronicsP roductsAB Elektronik-SystemeLauerGmbH&Co. KG BeijerElectronicsInc.Box426 Kelterstraße5

Page 18 - BeijerElectronics, MAEN997

ContentsContents1 Safety Precautions ... 41.1 General ...

Page 19 - Shielded cable Shielded cable

Safety Precautions1SafetyPrecautionsBoth the installer and the owner and/or operator of the operator panel must readand understand this installation m

Page 20 - 6.4 AmbientTemperature

Safety Precautions1.3 DuringUse• Keep the o perator panel clean.• Emergency stop and other safety functions may not be controlled from theoperator pan

Page 21 - 6.5 Safety

Installation2Installation2.1 SpaceRequirements• Installation plate thickness: 1.5 - 7.5 mm (0.06 - 0.3 inch)• Space requirements when installing the o

Page 22 - 6.6 GalvanicIsolation

Installation2.Place the panel cut out where the operator panel is to be situated, draw alongthe outer sides of the holes and cut according to the mark

Page 23 - Inside operator panel

Installation4.Connect the cables in the specified order, according to the drawing and stepsbelow.Caution:• Ensurethattheoperatorpanelandthecontrollersy

Page 24

Installation2.2.1 ModeSwitchesAll mode switches must be in OFF position during operator panel u se.Themodeswitchesshouldnotbetouchedunlessbyqualifiedpe

Commentaires sur ces manuels

Pas de commentaire