iXT12CInstallationManualEnglishMAEN082D,2013-09
Hardware Replacement3 HardwareReplacementThis section contains instructions on how to replace operator panel hardware.Only components included in the
Hardware Replacement4.Remove the fan by removing the two M4x35 Torx screws.5.Reassemble with new fan and filter in reverse order. Use a maximum torque
Hardware Replacement3.2 Replacingthe2.5”SATAMassStorageThe following is needed:• A new 2.5” SATA mass storage• A T X10 Torx screwdriverNote:Makesureto
Hardware Replacement5.Remove the hard disk drive from the hard drive connection on the CPUboard.6.Reassemble with the new hard disk drive in reverse o
Hardware Replacement3.3 ReplacingaCompactFlashorCFastMemoryCardThe following is needed:• A new CompactFlash or CFast memory card.• A T X10 Torx screwd
Hardware Replacement3.4 ReplacingtheBatteryThe following is needed:• A new BR 2032 (or CR 2032) battery.• A Torx screwdriverNote:Makesuretouseadequate
Technical Data4TechnicalDataParameter iXT12CFrontpanel,W×H×D 340×242×79mmCutoutdimensions,W×H324×226mmMountingdepth 72mm(172mmincludingclearance)Stand
Technical DataParameter iXT12CPowersupply DCinputrange: 18-32VDC(140W)ATXstandardCE:ThepowersupplymustconformwiththerequirementsaccordingtoIEC60950and
Chemical Resistance5 ChemicalResistance5.1 MetalCasingThe frame and casing material is powder-coated aluminum. This powder paintwithstands exposure to
Chemical Resistance5.2 TouchScreenandOverlay5.2.1 AutotexF157/207Autotex F157 or F207 covers the overlay surrounding the touch screen.SolventResistanc
ForewordInstallationmanualforiXT12CForewordAll operator panels are developed to satisfy the demands of human-machinecommunication. Built-in functions
Chemical Resistance5.2.2 TouchScreenSurfaceThe touch screen surface on the operator panel withstands exposure to thefollowing solvents without visible
Operator Panel Drawings6 Opera torPanelDrawings6.1 Connectors12345678 9Pos. Connector Description1DVI Externalmonitor2VGA Externalmonitor3 COM3/4 Comm
Operator Panel DrawingsNote:Inordertoutilizetwocommunicationportsonthesamephysicalport,theY-splitcableCAB109mustbeused.DrawingforexternalcableCAB109(d
Operator Panel Drawings6.3 iXT12COutline224 99max. 8 mm77224234032299BeijerElectronics, MAEN082D23
Operator Panel DrawingsNote:AStepCADfileisavailableonthewebsitewww.beijerelectronics.comBeijerElectronics, MAEN082D24
Additional Installation Tips7 AdditionalInstallationTi psWhen experiencing communication problems in for example noisy environmentsor when operating c
Additional Installation TipsNote:Thegroundingwiresshouldbeshortandt heconductorshouldhavealargearea.Along,thingroundingwirehasaveryhighimpedance(resis
Additional Installation TipsA good solution may be to use a shielded Ethernet cable, but to co nnect the shieldat one end only.One option is to break
Additional Installation Tips7.3 ToAchieveBetterEMCProtection• Initially, use the original cabling from Beijer Electronics primarily.• Use shielded cab
Additional Installation Tips7.4 AmbientTemperatureThe maximum ambient temperature for the operator panel is provided in thespecifications. The ambient
ContentsContents1 Safety Precautions ... 41.1 General ...
Additional Installation Tips7.5 SafetyMost of the operator panels are fed with 24 V DC.412434Power supply230 V AC to 24 V DCPower supply230 V AC to 24
Additional Installation Tips7.6 CableandBusTe rminationRS485• If maximum transfer distan ce and maximum transfer speed is needed,shielded and twisted
Additional Installation Tips7.7 BootPriorityThe boot priority is the order in which the hardware storage devices are read.Pressing F7 durin g boot wil
Additional Installation Tips7.9 ResetSwitchA reset switch is located under the fan lid.Follow the instructions in chapter Replacing the Fan and Filter
HeadofficeBeijerElectronicsABBox42620124Malmö,Swedenwww.beijerelectronics.com/+4640358600
Safety Precautions1SafetyPrecautionsBoth the in staller and the owner and/or operator of the operator panel must readand understand this installation
Safety Precautions• Peripheral equipment must be appropriate for the application and location.1.3 DuringUse• Keep the operator panel clean.• Emergency
Installation2Installation2.1 SpaceRequirements• Maximum installation plate thickness: 8 mm• Space requirements in millimeters when installing the oper
Installation2.2 InstallationProcessThe following is needed:• ATorxTX7screwdriver1.Unpack and check the delivery. If damage is found, notify the suppli
Installation4.Connect the cables in the specified order, according to the drawing and stepsbelow.Caution:• Ensurethattheoperatorpanelandthecontrollersy
Installation2.2.1 ConnectionstotheControllerFor information about the cables to be used when connecting the operator panel tothe controller, please re
Commentaires sur ces manuels